log [2016/04/16 23:46] – [7th Meeting (2016-03-14)] team4log [2016/06/01 22:17] (current) – [10th Meeting (2016-05-19)] team4
Line 8: Line 8:
 On Monday we were informed that our project is going to be our first choice. Knowing that, we were able to start thinking about the topic. We prepared list of questions to our supervisors, after hearing answers, we had an other meeting with our main supervisors, Abel Duarte and Fernando Ferreira, who explained us possible materials, structures of the dome etc.  On Monday we were informed that our project is going to be our first choice. Knowing that, we were able to start thinking about the topic. We prepared list of questions to our supervisors, after hearing answers, we had an other meeting with our main supervisors, Abel Duarte and Fernando Ferreira, who explained us possible materials, structures of the dome etc. 
  
 +==== 3rd Week Report ====
 +In this week we started to work on our project- we divided tasks and goals among team members, we created the first draw of Gantt Chart. We also thought about use of our product-how we are going to sell it as, we decided that’s going to be a winter garden.
 +
 +==== 4th Week Report ====
 +During this week we made a logo and leaflet, we also started to work on wiki-state of the art, marketing and project management. We accomplished to do a the black box diagram and the structural drawings.
 +
 +==== 5th Week Report ====
 +In the fifth week, we did a cardboard model of our dome, we also improved our structural drafts of the dome. We started to create a material list for our dome. We continued working on wiki.
 +
 +==== 6th Week Report ====
 + We continued working on wiki, also list of materials. We started to design door and windows.
 +==== 7th Week Report ====
 +We finished our wiki report and also an interim presentation. 
 +==== 8th Week Report ====
 +After presenting our interim report and getting feedback from supervisors and teachers, we started to improve it-some grammatical mistakes and content, everyone is working on the part they wrote before:
 +
 +Introduction-Klaudia
 +
 +State of the Art-Arne
 +
 +Project Management- Klaudia
 +
 +Marketing-Arne and Klaudia
 +
 +Sustainability-Jairo and Gargely
 +
 +Ethics-Bogdan
 +
 +We also continued working on the design of windows and door.
 +==== 9th Week Report ====
 +Student Week
 +==== 10th Week Report ====
  
 ===== Meetings ===== ===== Meetings =====
Line 105: Line 137:
   * We have to use the same fabric for the dome, but it may not be possible to use the same material for the structure   * We have to use the same fabric for the dome, but it may not be possible to use the same material for the structure
  
-==== 6th Meeting (2016-03-06) ==== +==== 6th Meeting (2016-04-06) ==== 
-No Questions+No agenda
  
-==== 7th Meeting (2016-03-14) ====+==== 7th Meeting (2016-04-14) ====
 === Agenda === === Agenda ===
   * We are a little over budget, but since we use the same motor for both scale models, can we only buy 1 motor and switch them everytime we want to work with the other scale model ? Or do the scale models need to work at the same time  ?   * We are a little over budget, but since we use the same motor for both scale models, can we only buy 1 motor and switch them everytime we want to work with the other scale model ? Or do the scale models need to work at the same time  ?
Line 122: Line 154:
   *Finish the Wiki   *Finish the Wiki
  
 +==== 8th Meeting (2016-04-27) ====
 +  * For the functional tests, We were thinking about using a finite element program to control the strength and safety of the dome. Is this sufficient or do we also need to do some tests in real life ? 
 +  * About mechanisms implemented on windows and door, Should we simulate each one of them in a program?
 +  * Also for the functional tests, When will we obtain materials to start working?
 +
 +=== Minute: ===
 +  * We were corrected that we will be not running a test, but a modulation (helps us not with the real behaviour of structure)
 +  * We need to define door and windows-how and when it's going to open/close; define junction-how to assamble, how long it should take to assamble
 +  * We need to do a final drawing to obtain materials and animation of door and windows
 +==== 9th Meeting (2016-05-12) ====
 +
 +No agenda
 +
 +==== 10th Meeting (2016-05-19) ====
 +
 +  * Should we make our scale model in the EPS class or can we build it somewhere else ?
 +
 +=== Minute: ===
 +  * We need to prepare our scale model in workshop at university, because we can't take our materials home.
 +  * Rules in workshop must be obeyed, so we need to get to know them and the schedule before starting the work, as only space and tools of workshop can be used.
 +  * We also showed an animation of windows-we need to improve the design, and make some more detailed calculations.
 +
 +==== 11th Meeting (2016-06-02) ====
 +
 +  * Our servo motor doesn't work: 
 +  * Is there a shop in portugal where we can buy a new one ? If no, what was the shipping time of the servomotor on the online shop ?  
 +  * Our dome (2 meters in diameter) won't propably be able to stay in the lab for the whole time. Is there a place where we can put our prototype ? 
 ===== Activities ===== ===== Activities =====
 //Please register here all project activities// //Please register here all project activities//