Line 159: Line 159:
   * Also for the functional tests, When will we obtain materials to start working?   * Also for the functional tests, When will we obtain materials to start working?
  
 +=== Minute: ===
 +  * We were corrected that we will be not running a test, but a modulation (helps us not with the real behaviour of structure)
 +  * We need to define door and windows-how and when it's going to open/close; define junction-how to assamble, how long it should take to assamble
 +  * We need to do a final drawing to obtain materials and animation of door and windows
 ==== 9th Meeting (2016-05-12) ==== ==== 9th Meeting (2016-05-12) ====
  
Line 172: Line 176:
   * We also showed an animation of windows-we need to improve the design, and make some more detailed calculations.   * We also showed an animation of windows-we need to improve the design, and make some more detailed calculations.
  
 +==== 11th Meeting (2016-06-02) ====
 +
 +  * Our servo motor doesn't work: 
 +  * Is there a shop in portugal where we can buy a new one ? If no, what was the shipping time of the servomotor on the online shop ?  
 +  * Our dome (2 meters in diameter) won't propably be able to stay in the lab for the whole time. Is there a place where we can put our prototype ? 