EPS@ISEP | The European Project Semester (EPS) at ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
start [2016/03/03 10:49] – [Project Summary] team4start [2023/07/16 20:58] (current) team4
Line 1: Line 1:
-//This is the template of your wiki. It should be updated every week to introduce the weekly report, specify the agenda of the next meeting and write the minute of the last meeting.  
-Use the provided Google Drive folder for sharing and holding all EPS-related data.// 
 ===== Project Title ===== ===== Project Title =====
  
 +**Metallic & Fabric Dome**
  
 ===== Sponsor ===== ===== Sponsor =====
-//Insert the link to the project sponsor here// 
  
 +{{:logo_isep.jpg?nolink&200|}}
 ===== Project Summary ===== ===== Project Summary =====
 The goal is to design a dome composed of a metallic support structure and a fabric cover. The dome must be a V3 or V4 geo-dome with a diameter of 6.8 meter. The design main goals are: The goal is to design a dome composed of a metallic support structure and a fabric cover. The dome must be a V3 or V4 geo-dome with a diameter of 6.8 meter. The design main goals are:
-- To find a simple, robust and easy solution for the junction nodes of +  - To find a simple, robust and easy solution for the junction nodes of dome structure using metallic profiles. 
-dome structure using metallic profiles. +  To find and implement a solution for an articulate and automatic entrance door, which occupies a full hexagon. 
-– To find and implement a solution for an articulate and automatic entrance door, which occupies a full hexagon. +  To find and implement a solution for the automatic operation of the windows. 
-– To find and implement a solution for the automatic operation of the +  To build a scale model and/or a full scale detail of the structure, e.g. the junction node.
-windows. +
-– To build a scale model and/or a full scale detail of the structure, e.g. the junction node.+
  
 The project requirements are:   The project requirements are:  
Line 39: Line 36:
  
 **Panel of Supervisors**:  **Panel of Supervisors**: 
-  * Abel Duarte (ajd 'at' isep 'dot' ipp 'dot' pt) +  * **Abel Duarte** (ajd 'at' isep 'dot' ipp 'dot' pt) 
-  * Fernando Ferreira (fjf 'at' isep 'dot' ipp 'dot' pt) +  * **Fernando Ferreira** (fjf 'at' isep 'dot' ipp 'dot' pt) 
-  * Maria Benedita Malheiro (mbm 'at' isep 'dot' ipp 'dot' pt) +  * Benedita Malheiro (mbm 'at' isep 'dot' ipp 'dot' pt) 
-  * Maria Cristina Ribeiro (mcr 'at' isep 'dot' ipp 'dot' pt)+  * Cristina Ribeiro (mcr 'at' isep 'dot' ipp 'dot' pt)
   * Manuel Silva (mss 'at' isep 'dot' ipp 'dot' pt)   * Manuel Silva (mss 'at' isep 'dot' ipp 'dot' pt)
   * Paulo Ferreira (pdf 'at' isep 'dot' ipp 'dot' pt)   * Paulo Ferreira (pdf 'at' isep 'dot' ipp 'dot' pt)
-  * Pedro Barbosa Guedes (pbg 'at' isep 'dot' ipp 'dot' pt)+  * Pedro Guedes (pbg 'at' isep 'dot' ipp 'dot' pt)
  
 **Client**:  **Client**: 
QR Code
QR Code start (generated for current page)