Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| start [2016/03/03 10:50] – [Project Summary] team4 | start [2023/07/16 20:58] (current) – team4 | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | //This is the template of your wiki. It should be updated every week to introduce the weekly report, specify the agenda of the next meeting and write the minute of the last meeting. | ||
| - | Use the provided Google Drive folder for sharing and holding all EPS-related data.// | ||
| ===== Project Title ===== | ===== Project Title ===== | ||
| + | **Metallic & Fabric Dome** | ||
| ===== Sponsor ===== | ===== Sponsor ===== | ||
| - | //Insert the link to the project sponsor here// | ||
| + | {{: | ||
| ===== Project Summary ===== | ===== Project Summary ===== | ||
| The goal is to design a dome composed of a metallic support structure and a fabric cover. The dome must be a V3 or V4 geo-dome with a diameter of 6.8 meter. The design main goals are: | The goal is to design a dome composed of a metallic support structure and a fabric cover. The dome must be a V3 or V4 geo-dome with a diameter of 6.8 meter. The design main goals are: | ||
| - | - Ordered List ItemTo | + | - To find a simple, robust and easy solution for the junction nodes of dome structure using metallic profiles. |
| - | dome structure using metallic profiles. | + | - To find and implement a solution for an articulate and automatic entrance door, which occupies a full hexagon. |
| - | - Ordered List Item To find and implement a solution for an articulate and automatic entrance door, which occupies a full hexagon. | + | - To find and implement a solution for the automatic operation of the windows. |
| - | - Ordered List ItemTo | + | - To build a scale model and/or a full scale detail of the structure, e.g. the junction node. |
| - | windows. | + | |
| - | - Ordered List ItemTo | + | |
| The project requirements are: | The project requirements are: | ||
| Line 39: | Line 36: | ||
| **Panel of Supervisors**: | **Panel of Supervisors**: | ||
| - | * Abel Duarte (ajd ' | + | |
| - | * Fernando Ferreira (fjf ' | + | |
| - | * Maria Benedita Malheiro (mbm ' | + | * Benedita Malheiro (mbm ' |
| - | * Maria Cristina Ribeiro (mcr ' | + | * Cristina Ribeiro (mcr ' |
| * Manuel Silva (mss ' | * Manuel Silva (mss ' | ||
| * Paulo Ferreira (pdf ' | * Paulo Ferreira (pdf ' | ||
| - | * Pedro Barbosa | + | * Pedro Guedes (pbg ' |
| **Client**: | **Client**: | ||